Which charge point rules apply to businesses?

Since 1 January 2025, an existing business building in the Netherlands (a non-residential building) with more than 20 parking spaces must have at least one charge point. From 1 January 2027, this becomes at least one charge point per 10 parking spaces, or cable ducts for half of the spaces.

The rules come from the European EPBD directive and are set out in the Dutch building code, the Besluit bouwwerken leefomgeving (Bbl). Sources, in Dutch: for 2025, the Informatiepunt Leefomgeving, Oplaadpunten bij bestaande bouw (articles 3.87b and 3.87c Bbl); for 2027, RVO, Laadinfrastructuur voor elektrisch vervoer.

Existing buildings with more than 20 parking spaces

From What is required
1 January 2025 At least 1 charge point
1 January 2027 At least 1 charge point per 10 parking spaces, or cable ducts for half of the parking spaces

New builds and major renovations

Stricter rules apply to new non-residential buildings with more than 5 parking spaces, and to major renovations of them: 1 charge point per 5 parking spaces (1 per 2 for offices) and pre-cabling for at least half of the spaces. Source: RVO, Handreiking laadinfrastructuur bij gebouwen (EPBD IV) (in Dutch).

Which parking spaces count?

  • Indoor and outdoor parking spaces, if they are on the same plot as the building.
  • Parking spaces in public areas (municipal land) do not count.

Car dealers, rental companies and similar businesses have an exception for the spaces they use for parking, storage or stock for sale.

Who is responsible?

The owner of the building. A charge point operator (CPO) may install and manage the charge points, but the owner remains the point of contact for the municipality.

How can WIM help?

WIM does not install chargers; your installer does that. Once the charge points are in place, WIM manages them remotely, with your own rate and monthly settlement. Charge cards from other providers and paying by card via the QR sticker are included in WIM Management at no extra cost. They are not on by default: we switch them on per charge point, at your request. Once they are switched on, more than 90% of charge cards work. If the new rules mean more charge points on the same connection, load balancing can help. Also read Glossary: CPO, back office, OCPP and EVSE ID.

The exact requirements for your building are in the Bbl. If you are unsure, ask your municipality or RVO.